Home Products Product Selector Case Studies About Us Blog Contact
English中文EspañolالعربيةFrançaisPortuguês
Flange Repair Clamp
Pipe Repair Clamps

Flange Repair Clamp

Professional flanged repair clamp for pipe repair and replacement.

DN50 – DN500
2" – 20"
1.0 MPa
Ductile iron QT450-10
EPDM
Inquire Now

Specifications

How to read the model number: GH100 = repair of the flanged joint on a DN100 ductile iron or steel pipe.
Model DN NPS OD (mm) OD (in) Clamp D (mm) Clamp D (in) Length (mm) Length (in)
GH80 DN80 3" 88.5 mm 3.48" 240 mm 9.45" 250 mm 9.8"
GH65 DN65 2½" 75.5 mm 2.97" 220 mm 8.66" 230 mm 9.1"
GH50 DN50 2" 60 mm 2.36" 200 mm 7.87" 220 mm 8.7"
GH100 DN100 4" 118 mm 4.65" 260 mm 10.24" 280 mm 11.0"
GH150 DN150 6" 170 mm 6.69" 325 mm 12.80" 295 mm 11.6"
GH200 DN200 8" 222 mm 8.74" 380 mm 14.96" 300 mm 11.8"
GH300 DN300 12" 326 mm 12.83" 505 mm 19.88" 350 mm 13.8"
GH400 DN400 16" 429 mm 16.89" 600 mm 23.62" 360 mm 14.2"
GH500 DN500 20" 532 mm 20.94" 730 mm 28.74" 370 mm 14.6"

Frequently Asked Questions

What pipe types and sizes is the Flange Repair Clamp compatible with?
The Flange Repair Clamp fits DN50 to DN500 pipelines and is engineered for ductile iron and carbon and galvanized steel. It seals longitudinal cracks, pinholes, circumferential fractures, and joint leaks without cutting out the damaged pipe section.
What is the working pressure rating?
Rated for 1.0 MPa. Standard clamp bodies are tested to at least PN16 (1.6 MPa); higher-pressure variants are available on request for gas-distribution and industrial service.
Can this clamp be installed on a live, pressurized pipeline?
Yes. The Flange Repair Clamp is designed for installation on live pipelines under pressure, which means municipal water, gas, or process flow does not have to be interrupted. Our technical team provides pre-install checklists to ensure safe deployment.
What materials are used in the body and sealing gasket?
Construction — shell: Ductile iron QT450-10 · seal: EPDM. Corrosion-resistant stainless-steel banding (SUS304 / SUS316) with EPDM (potable water) or NBR (oil / hydrocarbon service) gaskets is available depending on the application.
What is the lead time and how is it shipped?
Standard lead time is 15 working days ex-factory, shipping FOB Shanghai. Sea, air, and combined transport are arranged through PipeKnot to over 40 countries. Volume orders and project tenders receive priority scheduling.
Is installation guidance and technical support included?
PipeKnot provides English-language installation drawings, torque specifications, and remote technical support. On-site commissioning support can be arranged for qualifying projects in partnership with Anhui Tongfa field engineers.

Get in Touch

Have questions about our products? Call, email, or send us an inquiry — we respond within 24 hours.

FOB Shanghai | Lead time: 15 working days
Thank you! Your inquiry has been sent successfully.
Something went wrong. Please email us directly at info@pipeknot.com