Home Products Product Selector Case Studies About Us Blog Contact
English中文EspañolالعربيةFrançaisPortuguês
Direct Repair Clamp for PE Pipe
Pipe Repair Clamps

Direct Repair Clamp for PE Pipe

Compact slim-profile repair clamp for welded joints on PE pipe. Outer diameter 50–315 mm.

1.0 MPa
Ductile iron QT450-10
EPDM
Inquire Now

Specifications

How to read the model number: P200 = weld-joint repair for a PE pipe with OD 200 mm.
Model OD (mm) OD (in) Clamp D (mm) Clamp D (in) Length (mm) Length (in)
P50 50 mm 1.97" 69 mm 2.72" 70 mm 2.8"
P63 63 mm 2.48" 82 mm 3.23" 70 mm 2.8"
P75 75 mm 2.95" 92 mm 3.62" 70 mm 2.8"
P90 90 mm 3.54" 107 mm 4.21" 70 mm 2.8"
P110 110 mm 4.33" 127 mm 5.00" 70 mm 2.8"
P125 125 mm 4.92" 142 mm 5.59" 80 mm 3.1"
P160 160 mm 6.30" 176 mm 6.93" 80 mm 3.1"
P200 200 mm 7.87" 219 mm 8.62" 100 mm 3.9"
P225 225 mm 8.86" 248 mm 9.76" 100 mm 3.9"
P250 250 mm 9.84" 269 mm 10.59" 100 mm 3.9"
P315 315 mm 12.40" 335 mm 13.19" 100 mm 3.9"

Frequently Asked Questions

What pipe types and sizes is the Direct Repair Clamp for PE Pipe compatible with?
The Direct Repair Clamp for PE Pipe fits DN50 to DN315 pipelines and is engineered for PE (HDPE). It seals longitudinal cracks, pinholes, circumferential fractures, and joint leaks without cutting out the damaged pipe section.
What is the working pressure rating?
Rated for 1.0 MPa. Standard clamp bodies are tested to at least PN16 (1.6 MPa); higher-pressure variants are available on request for gas-distribution and industrial service.
Can this clamp be installed on a live, pressurized pipeline?
Yes. The Direct Repair Clamp for PE Pipe is designed for installation on live pipelines under pressure, which means municipal water, gas, or process flow does not have to be interrupted. Our technical team provides pre-install checklists to ensure safe deployment.
What materials are used in the body and sealing gasket?
Construction — shell: Ductile iron QT450-10 · seal: EPDM. Corrosion-resistant stainless-steel banding (SUS304 / SUS316) with EPDM (potable water) or NBR (oil / hydrocarbon service) gaskets is available depending on the application.
What is the lead time and how is it shipped?
Standard lead time is 15 working days ex-factory, shipping FOB Shanghai. Sea, air, and combined transport are arranged through PipeKnot to over 40 countries. Volume orders and project tenders receive priority scheduling.
Is installation guidance and technical support included?
PipeKnot provides English-language installation drawings, torque specifications, and remote technical support. On-site commissioning support can be arranged for qualifying projects in partnership with Anhui Tongfa field engineers.

Get in Touch

Have questions about our products? Call, email, or send us an inquiry — we respond within 24 hours.

FOB Shanghai | Lead time: 15 working days
Thank you! Your inquiry has been sent successfully.
Something went wrong. Please email us directly at info@pipeknot.com